PRGProgress
Site Control
System operational Open channel
PRG infrastructure site under digital survey
A-01 / HERO Model load — 100%

Progress
PRG

We build infrastructure that carries the future — airports, state, industrial and urban assets. Surveyed, measured, and brought onto a single control surface.

Operating since1994
Asset categories4+
Coverage24/7
SignalLIVE
A-02 / LEGACY Evidence, not nostalgia

A construction record
read as live terrain

Three decades of building in Azerbaijan — from dense urban cores to national aviation infrastructure. The past is held here as evidence: durable execution, accountable handover, and a delivery discipline that survives beyond daily coordination.

Founded1994 · Baku
SectorsAviation · Civic
 Industrial · Urban
PostureBIM / VDC ready
Datum40.382 / 49.861
StatusOperational
30
Years of delivery
4+
Public asset categories
A-Z
Survey to handover
0.0
Unverified live claims
A-03 / PORTFOLIO Command timeline

Built proof,
presented as
operational terrain

Move through the assets like records in a control system: one active visual, dense technical metadata. Each asset opens to a full survey sheet.

A-03.1 / AVIATION SCAN OKGRAYSCALE 0.35SURVEY LOCK Fuzuli International Airport Helicopter Maintenance Hangar State Customs Committee Building DTK Building Fuzuli, Azerbaijan

Fuzuli International Airport

Large-scale aviation work presented as a signal project for speed, coordination, and critical-infrastructure execution.
A-04 / TECHNOLOGY Construction discipline

Future operations,
translated into
field discipline

The futuristic layer is not decoration — it is structured data from day one, so a private command view can later be real, not a dashboard of fake metrics.

01 / TWIN

Digital twin ready

Project data, visual progress and site records structured from day one so future command views map back to the real asset.

Boundary · no live claims
02 / VDC

BIM / VDC coordination

Model-led planning, clash-aware coordination and measurable site control as an operating posture.

Posture · moving model-led
03 / AI

AI-supported reporting

AI inside planning summaries, document search and progress signals — where it reduces friction, with citations.

Mode · approved sources only
04 / SCAN

Visual inspection layer

Drone capture, site photos, QA and safety evidence as a future operational layer inside the command surface.

Layer · field evidence
A-05 / COMMAND LAYER No-live operating model

The website can
become an
operational surface

Today this is a public proof surface. The same spine maps portfolio proof, identity, file rooms, AI source intelligence and owner launch gates — without pretending any live integration exists yet.

PRG // SITE CONTROL
prg@control:~$
aviation industrial civic urban
01 / public proof

Portfolio facts

Imagery, scopes and claims stay public only after approved wording.

Public anchors
02 / identity

Contacts + Cards

Staff roles, QR previews and ownership paths, gated by SSO.

Staff directory
03 / source authority

File rooms

Folders, registers and handover packages without copying private files out.

Handover views
04 / intelligence

AI source layer

Answers only from approved packs with citations and refusals.

Briefings
05 / control

Owner gates

Production, DNS, monitoring, rollback and acceptance stay explicit.

Acceptance matrix
PRG // SITE CONTROL ·40°23′12″N 49°51′40″E·ALT 28M ·00:00:00 AZT ·● OPERATIONAL